Altran Magnetics JOB DESCRIPTION
Warehouse Associate
| Job Title | Warehouse Associate |
| Department | Operations |
| Reports To | Operations Manager |
| Location | Altran Magnetics |
| Document Type | Job Description (HR-JD) |
| Version | v1.0 |
| Document Owner | Human Resources |
| Competence | Expected Behavior | Application |
| Accuracy and inventory control | Check item codes, quantities and locations; keep records complete. | Receiving, picking, packing, and stock counts. |
| Safety and equipment care | Follow safe handling practices, PPE rules and equipment checks; report hazards. | Material movement, storage, and housekeeping. |
| Organization and reliability | Prioritize assigned work and meet agreed deadlines without bypassing controls. | Shipment preparation and daily task completion. |
| Communication and teamwork | Share clear updates and escalate discrepancies promptly. | Coordination with the manager, carriers, and internal teams. |
| Quality and practical problem-solving | Follow approved instructions, identify defects, and seek guidance when needed. | Assembly, rework, and shipment verification. |
| Objective | Key Result | Target | Source |
| Accurate dispatch | Shipments dispatched without item, quantity or labeling errors / total shipments. | At least 99% | Dispatch checks; error log |
| On-time dispatch | Shipments ready by the agreed carrier cutoff / shipments scheduled. | At least 98%; document external delays | Dispatch schedule; carrier handover records |
| Reliable receiving | Receipts checked and recorded within one working day / total receipts. | At least 98%; flag discrepancies the same day | Receiving records; discrepancy log |
| Inventory accuracy | Counted item/location records matching physical stock / total counted records. | At least 99% | Cycle-count sheets; warehouse system |
| Quality workmanship | Assembly/rework tasks accepted at first check / tasks checked. | At least 98% | Work orders; quality checks |
| Safe, orderly operations | Required pre-use and housekeeping checks completed; observed hazards and incidents reported. | 100% of required checks; report promptly in the same shift | Safety checklists; incident reports |
| Name | Role | Signature / Date |
| To be completed at sign-off | Employee | |
| To be completed at sign-off | Line Manager – Operations Manager | |
| To be completed at sign-off | Human Resources Manager |